Mengapa Proyek Perangkat Lunak Gagal (Penerapan Manajemen Resiko dalam Proyek Perangkat Lunak)

Authors

  • Yasmi Afrizal Universitas Komputer Indonesia

DOI:

https://doi.org/10.30595/juita.v1i1.281

Abstract

The greater and problems complex of software development project enables the event of failure. Risk management is an approach to guide minimization or lessens the failure impact. This paper is explain risk management model
base that probe event risk in developing software. Risk management has step of solution consisted of by identification, analysis, mitigation strategy risk. This paper also very useful to assist academician, researcher and practitioner to be more understanding risk management as one part of the software engineering.

References

Boehm, B. W. 1988. “A Spiral Model of Software Development and Enhancement”, Computer, May, 61-72.

Boehm, B. W. 1991.â€Software Risk Management: Principles and Practicesâ€, IEEE Software, 8(1):32-41 .

Boehm, B. W. and Bose, P. 1994. “A Collaborative Spiral Software Process Model Based on Theory W”, Proceedings of the 1994 International Conference on Software Process, IEEE Computer Society, Washington.

Deursen, A. and Kuipers, T. 2003. “Source-Based Software Risk Assessment”, Proceedings of the 2003 International Conference on Software Maintenance, Amsterdam, Netherlands.

Hall, E. M. 1998. Managing Risk: Methods for Software Systems Development, Addison-Wesley, Reading, U.K.

Higuera R. P. and Haimes, Y. Y. 1996. “Software Risk Management”, Technical Report, Report # CMU/SEI-96-TR-012, Software Engineering Institute, Carnegie Mellon University, Pittsburgh, PA, USA.

Karolak, D. 1996. Software Engineering Risk Management, IEEE Computer Society Press, Los Alamitos, CA, USA.

Karolak, D. 1998. “Software Engineering Risk and Just-In-Time

Developmentâ€, International Journal of Computer Science and

Information Management, 1 .

Kontio, J. 2001. “Software Engineering Risk Management: A Method, Improvement Framework, and Empirical Evaluation”. Ph.D. Thesis, Department of Computer Science and Engineering, Hensinki University of Technology, Finland, 2001.

Yasmi Afrizal and Agus Harjoko. 2009. “Perangkat Lunak JIT (Just In Time) untuk Memprediksi Resiko Proyek Perangkat Lunak”, Jurnal Sistem Informasi Universitas Kristen Maranatha, Volume 4 Nomor 1 Maret 2009.

Downloads

How to Cite

Afrizal, Y. (2016). Mengapa Proyek Perangkat Lunak Gagal (Penerapan Manajemen Resiko dalam Proyek Perangkat Lunak). JUITA: Jurnal Informatika, 1(1). https://doi.org/10.30595/juita.v1i1.281

Issue

Section

Articles